Menu

FES Requirements Review 2025

Quick Links

Goals

The primary purpose of an ESnet Requirements Review is to discuss and analyze current and planned science use cases and anticipated data output of a particular program, user facility, or project to inform ESnet’s strategic planning, including network operations, capacity upgrades, and other service investments. The goal of this particular review is to accurately characterize the networking requirements of science funded by the FES Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class support for scientific discovery for DOE scientists and their collaborators. The tangible outcome of the review will be a document that includes both the network requirements and a supporting narrative. 

The Requirements Review is an in-person event. By design a highly conversational process through which all participants gain shared insight into the salient data management challenges of the subject program/facility/project. The ESnet Science Engagement Team organizes, convenes, and executes the Review in close coordination with the ESnet Program Manager and one or more leads from the subject program/project/facility.

ESnet will focus the Review to deliver the following outcomes:

  • Identification and analysis of any data management gaps and/or network bottlenecks that are barriers to achieving the scientific goals.
  • A forecast of capacity/bandwidth needs by area of science, particularly in geographic regions where data production/consumption is anticipated to increase or decrease. 
  • Development of a shared understanding of the data management needs, challenges, and capability gaps that could inform strategic investments in solutions.

Review Objectives, Outcomes, and Artifacts

  • Through a cases study methodology, the Review provides ESnet with information about:
  • Existing and planned data intensive science experiments and/or user facilities, including the geographical locations of experimental site(s), computing resource(s), data storage, and research collaborator(s). 
  • For each experiment/facility project, a description of the “process of science,” including the goals of the project, how experiments are performed and/or how the facility is used. This description includes information on the systems and tools used to analyze, transfer, and store the data that is produced. 
  • Current and anticipated data output on near and long term time scales.
  • Timeline(s) for building, operating, and decommissioning of experiments, to the degree these are known.

  • Existing and planned network resources, usage, “pain points” or bottlenecks in transferring or productively using data the science produces.

Schedule

The review will be a 2-day event, and we are working on the specific dates.  We are anticipating December of 2025

Review Attendance & Registration

The review is by invitation only.  There is no travel funding available for attendance. 

Review Report

This review will generate a network requirements document for the FES Program Office. This document will be composed of the network requirements input from the workshop attendees.

Review attendees should review the case study template document and other background materials on the documents page. Please also review the pages on the ESnet public web site. Please then use the background materials in combination with your own knowledge and experience, as well as input from representatives from your facility and laboratory, to generate a narrative describing your scientific research, instrument, facility or other scientific endeavor. Examples of science narratives with their accompanying requirements matrices can be found in the reports from previous reviews

At the review we will review the documents and speak with the attendees to ensure that we understand the science being done insofar as it has an impact on networking. We will also make sure that we capture the timelines for upgrades, new facilities, changing collaborations, and other coming events that will change the way in which the network is used.

The review format is much closer to a round-table discussion rather than a series of PowerPoint presentations. If you feel that you really need to give a formal presentation we can accommodate that by providing a suggested template, but we have found that these review are more productive if there is a simple discussion and exchange of ideas rather than a formal presentation format.

Logistics

These details are being worked on, and will be released closer to the event.  The review will be in the MD/VA/DC area.  

Remote Access

These details are being worked on, and will be released closer to the event.  

Parking

These details are being worked on, and will be released closer to the event.  

Airport Info

There are two airports in Washington DC area, both are ~30miles from the venue:

  • Ronald Reagan Washington National Airport (DCA)
  • Washington Dulles International Airport (IAD)

Ground Transportation

These details are being worked on, and will be released closer to the event.  

Agenda

These details are being worked on, and will be released closer to the event.  

Webinars

There will be webinars offered by the ESnet and DOE teams to discuss the FES review process, the Case Studies, the expectations for participants, the associated timelines, and provide an opportunity to ask questions. These will occur:

  • Thursday September 25th 2025 at 11am ET

  • Friday October 3rd at 3pm ET

All participants are encouraged to attend or listen to at least one of the webinars, they will be recorded.